Team #12: Mickelson & Co. Contacts: Michael Fazio, Public Works Director, mfazio@bluffdale.com Addison Mitton, (801) 849-9427 Dan Tracer Faculty Mentor: Dr. Macfarlane Team Members: Clinton Childers, Joe Wells, Trevor Mickelson, Robert Mickelson
A corridor study to establish what is the current traffic and the ultimate traffic on 14600 South Street (Bluffdale Boulevard), establish a typical cross-section, provide proper pedestrian and bike facilities and study the drainage to provide proper drainage and an outfall. A report providing forecast of future road use in the next 5 years, 10 years and ultimate. Possible typical cross-sections that would provide sufficient volume for the projected annual average daily traffic. Study the need for pedestrian facilities and provide in the typical cross-section. Study the drainage for the ultimate needs of the facility and provide an ultimate outfall location. Provide all this in maps and exhibits in the report.