Skip to main content

CEEN-2020CPST-009 Project Reports

Title: CEEN-2020CPST-009: Redwood Road Drainage Capacity

Project Sponsor: Bluffdale City

Project Description: This project consists of hydraulic analyses of two existing natural drainage channels in a rapidly developing area. The analyses should include: delineating the watershed for both channels, analyzing their existing capacity throughout the channel lengths, including several existing culverts, providing a preliminary design to connect these drainages to the Jordan River rather than their current outfalls.

Project Team Members: Matthew Bueckers, Braden Day, Chris Means, Cristian Dorrett (Team Focal)

Faculty Advisor: Rollin Hotchkiss

Statement of Work

Project Status Reports:

  1. 2020-Oct-07 Status Report
  2. 2020-Oct-14 Status Report
  3. 2020-Oct-21 Status Report
  4. 2020-Oct-28 Status Report
  5. 2020-Nov-04 Status Report
  6. 2020-Nov-11 Status Report
  7. 2020-Nov-18 Status Report
  8. 2020-Dec-02 Status Report
  9. 2021-Jan-27 Status Report
  10. 2021-Feb-03 Status Report
  11. 2021-Feb-10 Status Report
  12. 2021-Feb-18 Status Report
  13. 2021-Feb-24 Status Report
  14. 2021-Mar-02 Status Report
  15. 2021-Mar-09 Status Report
  16. 2021-Mar-16 Status Report
  17. Special Status Update
  18. 2021-Mar-23 Status Report
  19. 2021-Mar-30 Status Report
  20. 2021-Apr-06 Status Report

30% Completion Report

Final Report

Final Presentation

Project Poster