CEEN-2020CPST-009 Project Reports
Title: CEEN-2020CPST-009: Redwood Road Drainage Capacity
Project Sponsor: Bluffdale City
Project Description: This project consists of hydraulic analyses of two existing natural drainage channels in a rapidly developing area. The analyses should include: delineating the watershed for both channels, analyzing their existing capacity throughout the channel lengths, including several existing culverts, providing a preliminary design to connect these drainages to the Jordan River rather than their current outfalls.
Project Team Members: Matthew Bueckers, Braden Day, Chris Means, Cristian Dorrett (Team Focal)
Faculty Advisor: Rollin Hotchkiss
Project Status Reports:
- 2020-Oct-07 Status Report
- 2020-Oct-14 Status Report
- 2020-Oct-21 Status Report
- 2020-Oct-28 Status Report
- 2020-Nov-04 Status Report
- 2020-Nov-11 Status Report
- 2020-Nov-18 Status Report
- 2020-Dec-02 Status Report
- 2021-Jan-27 Status Report
- 2021-Feb-03 Status Report
- 2021-Feb-10 Status Report
- 2021-Feb-18 Status Report
- 2021-Feb-24 Status Report
- 2021-Mar-02 Status Report
- 2021-Mar-09 Status Report
- 2021-Mar-16 Status Report
- Special Status Update
- 2021-Mar-23 Status Report
- 2021-Mar-30 Status Report
- 2021-Apr-06 Status Report